Subway Air Conditioning Project - Guangzhou Metro Line 6 And 21 -上海汉钟精机股份有限公司

凯发·k8国际

En

Subway Air Conditioning Project - Guangzhou Metro Line 6 And 21

Project Introduction

The second stage of Guangzhou Metro Line no.6 is about 17.4km, with 10 stations. The length of line 21 is about 61.5km, with 20 stations. Hanbell RC2-E compressors are used.

image.png

凯发·k8国际